WEST BOYLSTON- REHABILITATION & STORMWATER IMPROVEMENTS ON STERLING STREET (ROUTE 12/140) AT THE WACHUSETT RESERVOIR
The proposed project involves rehabilitation of a section of Route 140/12 in the Town of West Boylston. A major component of the project is to provide stormwater mitigation for direct discharges to the Wachusett Reservoir. Additionally, the project involves reconstruction of existing sidewalk and construction of new sidewalk to provide pedestrian connection to existing sidewalk. Related work involves improvements to guardrail and relocation the driveway to a gravel parking lot to improve sight distance for exiting vehicles.
Location:
  • Town of West Boylston
  • Resident Engineer: Michael Chauvin
    Construction Bid Price: $2,710,812.48
    District: District 3

    Contracts (2) Progress
    # 68940 -- Design -- Hwy Eng Open End
    Work will consist of providing engineering design services to MassDOT on a task order basis for Layout and Right of Way assignments. Final
    # 90716 -- Construction Contract
    Roadway Reconstruction and Drainage Repairs along a Section of Sterling Street (Route 12/140). Completed

    Bridges

  • - none -
  • Contract Dates
    Notice to Proceed: 03/16/2016
    Contract Information
    Project Designer: Other
    Funding Source: Surface Trans. Program
    See the Milestone Details tab for additional Project information
    Property Impacts - Right of Way
    no comments
    Environmental Impacts
    no comments
    Project Design
    no comments
    Project Funding
    no comments
    Public Involvement
    no comments
    Construction
    no comments
    Accelerated Bridge Program
    no comments
    No TIP Data Available For This Project
    Project Task Information
    Project Status
    Project Need Form PNF Entered 10/22/2013
    Project Initiation Form PIF Entered 10/22/2013
    Project Initiation Form PRC Submitted 11/15/2013
    Project Review Committee PRC Approved 04/07/2014
    Project Status Advertised 09/19/2015
    Project Management
    100% Design 100% Package Received 09/09/2015
    25% Design 25% Package Received 11/10/2014
    25% Design 25% Package Received 07/14/2015
    25% Design 25% Package Comments to DE 03/09/2015
    25% Design 25% Package Comments to DE 08/24/2015
    25% Design Design Public Hearing 08/10/2015
    Final Design PS&E Received 10/16/2015
    Final Design PS&E to FAPRO 09/15/2015