Project Description: |
WEST STOCKBRIDGE- DECK, JOINT & SUBSTRUCTURE REPAIRS TO W-22-024, ROUTE 102 (ALBANY STREET) OVER I-90 AND AT VARIOUS LOCATIONS ON I-90
This proposed contract will provide for the repair of bridge decks, joints, and sub-structure repairs on various bridges along the I-90 corridor within District One.
|
Location: |
|
Construction Begins: | Summer 2016 |
Resident Engineer: | Peter Lamarre |
Construction Bid Price: | $1,422,931.00 |
District: | District 1 |
|
Bridges
|
|
|
|
|