Project Description: |
DISTRICT 6- SCHEDULED & EMERGENCY DRAWBRIDGE MAINTENANCE, REPAIR, AND OPERATION AT VARIOUS LOCATIONS
Project involves the maintenance, repairs, and operation of drawbridges through out D-6.
|
Location: | |
Construction Begins: | Winter 2016/2017 |
Resident Engineer: | Mario Ferragamo |
Construction Bid Price: | $2,344,003.00 |
District: | District 6 |
|
Bridges |
|
|
|
|