Project Description: |
DISTRICT 6- SIDEWALK REPAIR AT VARIOUS LOCATIONS
This project will repair sidewalks at various locations as assigned.
|
Location: | |
Design Responsibility: | In-House Boston |
Right of Way Responsibility: | MassDOT |
Project Manager: | Stephen Thomas Simoglou |
Estimated Total Contract Cost: | $750,000.00 |
Estimated Total Federal Participating Construction Cost: | N/A |
District: | District 6 |
Current Status: | This project is in the preliminary design phase. |
|
Bridges |
|
|
|