Project Description:
BROCKTON- INTERSECTION IMPROVEMENTS AT LYMAN STREET/GROVE STREET/SUMMER STREET & REPLACEMENT OF GROVE STREET BRIDGE, B-25-005, OVER SALISBURY PLAIN RIVER
Work on this project includes reconstruction of the Lyman Street, Summer Street and Grove Street intersection, including the right turn slip lane from Summer Street northbound to Lyman Street eastbound. The existing traffic signal will be replaced, pavement will be reclaimed or overlaid and new loop detection installed. Pedestrian facilities (pedestrian curb ramps and pedestrian signals) will be installed/reconstructed to meet ADA/MUTCD compliance. New pavement markings and signage will be installed. The deteriorating Grove Street bridge which crosses the Salisbury Plain River will be entirely replaced. Project length includes 600 feet on Summer Street and 500 feet on Grove Street/Lyman Street for a total of approximately 1,100 feet.
Location:
  • City of Brockton
  • Design Responsibility: Municipality
    Right of Way Responsibility: Municipality
    Construction Begins: Spring 2026
    Project Manager: Kathy Dougherty
    Estimated Total Contract Cost: $5,718,799.75
    Estimated Total Federal Participating Construction Cost: $6,196,320.25
    Funding Provision: This project is planned to be funded through the 2025 Transportation Improvement Program for the Old Colony Metropolitan Planning Organization.
    District: District 5
    Current Status: 25% Package Received - Resub 3 (as of 06/12/2023 )

    Contracts (0) Progress
    No contracts associated with this project

    Bridges

    See the Milestone Details tab for additional Project information
    Property Impacts - Right of Way
    no comments
    Environmental Impacts
    no comments
    Project Design
    no comments
    Project Funding
    no comments
    Public Involvement
    no comments
    Accelerated Bridge Program
    no comments
    Planned Federal FY: 2025
    Responsible MPO: Old Colony Metropolitan Planning Organization
    Location: Municipality
    Cities: BROCKTON
    Category: Advertised Projects Constr.
    Budget Section: 1A
    Advance Construct: No
    Air Quality Exempt: No

  • a) Construction; b) Total Project Cost = $4,200,000 - STBG; d) MPO score 44.06; i) Status 25% Design
  • Category FA - Surface Trans. Block Grant (STBG)
    Federal Cost: $3,494,400.00
    State Cost: $873,600.00
    Total Cost: $4,368,000.00

    Project Task Information
    Project Status
    Project Need Form PNF Entered 12/20/2013
    Project Initiation Form PIF Entered 10/14/2014
    Project Initiation Form PRC Submitted 05/17/2016
    Project Review Committee PRC Approved 06/09/2016
    Project Management
    25% Design 25% Package Received 02/10/2017
    25% Design 25% Package Comments to DE 10/31/2017
    25% Design 25% Package Received - Resub 1 12/24/2019
    25% Design 25% Package Received - Resub 3 06/12/2023