| Project Description: |
BOSTON- SUPERPLUG ACCESS SHAFT CONSTRUCTION IN I-90 CONNECTOR TUNNEL (PHASE II - CRC 4B)
POSSIBLE TRUST FUND PROJECT
Design and Construction of access shafts adjacent to the I-90 Tunnel for the purpose of inspecting the full perimeter. Information shall be used to design a permanenet fix for the leaking superplug. The intent is to use the shafts as part of a permanent water remediation system.
|
| Location: |
|
| Construction Begins: | Winter 2019/2020 |
| Resident Engineer: | Daniel Stiven![]() |
| Construction Bid Price: | $2,925,059.10 |
| District: | District 6 |
|