Project Description: |
BOSTON- SUPERPLUG ACCESS SHAFT CONSTRUCTION IN I-90 CONNECTOR TUNNEL (PHASE II - CRC 4B)
POSSIBLE TRUST FUND PROJECT
Design and Construction of access shafts adjacent to the I-90 Tunnel for the purpose of inspecting the full perimeter. Information shall be used to design a permanenet fix for the leaking superplug. The intent is to use the shafts as part of a permanent water remediation system.
|
Location: |
|
Construction Begins: | Winter 2019/2020 |
Resident Engineer: | Charles Labbee |
Construction Bid Price: | $2,925,059.10 |
District: | District 6 |
|