Project Description: |
BOSTON- SUPERPLUG REHABILITATION IN I-90 CONNECTOR TUNNEL (PHASE III) (CRC 4C)
Possible Trust Fund Project
Construction of permanent solution to the superplug joint, to resolve the water infiltration.
|
Location: |
|
Design Responsibility: | Consultant |
Right of Way Responsibility: | MassDOT |
Project Manager: | Steven E McLaughlin |
Estimated Total Contract Cost: | $2,012,500.00 |
Estimated Total Federal Participating Construction Cost: | N/A |
District: | District 6 |
Current Status: | This project is in the preliminary design phase. |
|
Bridges |
|
|
|