BOSTON- REHABILITATION OF LOW POINT PUMP STATIONS & INSTALLATION OF NEW PLENUM PUMPS IN VARIOUS CA/T TUNNELS (CRC 16)
Scope for this project includes the investigation, design, bidding, and construction of two pumping systems within the limits of the CA/T Project due to various deficiencies. (A) Pumps at LP07, LP08, and LPVB1 need to be replaced with pumps that can handle solids (i.e. a 3 inch solid). (B) Install pumps in roadway plenums to effectively remove water from the roadway plenums. Approximately 13 plenum low point locations currently fill with water. This will also include installation of a permanent power supply and, where necessary, the installation of adequate access to maintain the pump system.
Location:
  • City of Boston
  • Construction Begins: Autumn 2017
    Resident Engineer: Daniel Stiven
    Construction Bid Price: $5,678,700.00
    District: District 6

    Contracts (2) Progress
    # 77866 -- Design -- Hwy Eng Open End
    Master Service Agreement for statewide design and review services. Final
    # 99739 -- Construction Contract
    Low Point & Plenum Sump Pump Replacements and Improvements in the Central Artery Tunnel Systems (Interstates 90 & 93) (CRC 16). Completed

    Bridges

  • - none -
  • Contract Dates
    Notice to Proceed: 12/12/2017
    Contract Information
    Project Designer: Consultant
    Funding Source: Non Federal Aid
    See the Milestone Details tab for additional Project information
    Initiation
    no comments
    Scoping
    no comments
    Property Impacts - Right of Way
    no comments
    Environmental Impacts
    no comments
    Project Design
    no comments
    Project Funding
    no comments
    Public Involvement
    no comments
    Construction
    no comments
    Accelerated Bridge Program
    no comments
    No TIP Data Available For This Project
    Project Task Information
    Project Status
    Project Need Form PNF Entered 02/24/2014
    Project Initiation Form PIF Entered 02/24/2014
    Project Initiation Form PRC Submitted 03/17/2014
    Project Review Committee PRC Approved 03/25/2014
    Project Status Advertised 02/11/2017
    Project Management
    75% Design 75% Package Received 10/01/2015
    75% Design 75% Package Comments to DE 01/21/2016
    Final Design PS&E Received 12/14/2016