Project Description:
BOSTON- CURTAIN WALL ANCHOR REPAIRS ON VARIOUS CA/T STRUCTURES AND ALBANY STREET EXTENSION FILL REMEDIATION (CRC 26)
Project to be funded with possible trust fund. Scope for this project includes investigation, design, bidding, construction, administration, and traffic control to implement solutions to repair the two deficiencies within the CA/T Project limits. Scope (A): the Stem to Stern report identified issue CV22 Precast Curtain Wall Anchors. At certain miscellaneous locations, anchors in the precast curtain wall panels are loosening, apparently due to traffic vibration. The very worst cases were replaced and repaired during the Stem to Stern process, but the remaining anchors were to be monitored and repaired. Scope (B): MassDOT maintenance crews discovered that the protective wall sections that protect the Styrofoam fill sections of the Albany Street Extension are starting to peel. The Styrofoam is becoming exposed and the covering on the panel is beginning to peel. This was discovered in the area between Ramp U (I90 Collector to Albany Street) and Albany Street Extension. Settlement of the walls appears to be the reason the foam is showing. The scope of work will include design services to review and design the repairs, and construction services to perform the repair.
Location:
  • City of Boston
  • Construction Begins: Summer 2017
    Resident Engineer: Jeovanny Rodriguez
    Construction Bid Price: $430,126.00
    District: District 6

    Contracts (2) Progress
    # 100437 -- Construction Contract
    Curtain Wall Anchor Repairs on Various CA/T Structures. Completed
    # 77857 -- Design -- Hwy Eng Open End
    Master Service Agreement for statewide design and review services. Final

    Bridges

  • - none -
  • Contract Dates
    Notice to Proceed: 09/20/2017
    Contract Information
    Project Designer: Consultant
    Funding Source: Non Federal Aid
    See the Milestone Details tab for additional Project information
    Property Impacts - Right of Way
    no comments
    Environmental Impacts
    no comments
    Project Design
    no comments
    Project Funding
    no comments
    Public Involvement
    no comments
    Construction
    no comments
    Accelerated Bridge Program
    no comments
    No TIP Data Available For This Project
    Project Task Information
    Project Status
    Project Need Form PNF Entered 02/26/2014
    Project Initiation Form PIF Entered 02/26/2014
    Project Initiation Form PRC Submitted 03/17/2014
    Project Review Committee PRC Approved 03/25/2014
    Project Status Advertised 05/13/2017
    Project Management
    100% Design 100% Package Received 06/08/2016
    25% Design 25% Package Received 01/08/2016
    Final Design PS&E Received 09/27/2016