Project Description:
BOSTON- MISCELLANEOUS RAMPS MICROSILICA OVERLAY REPLACEMENT ON I-90 & I-93 (CRC 28) CONTRACT 1
Possible Trust Fund funding Scope of this project includes investigation and analysis, administration, and traffic control to develop a plan to remove defective microsilica wearing surface. It is anticipated that, when this analysis is complete, a construction project will be developed to perform the replacement. The scope includes review of field conditions and inspection documents to develop a condition assessment. In addition, the scope includes the analysis of the structural implications of removing any overlay that is part of the viaduct structural slab.
Location:
  • City of Boston
  • Construction Begins: Autumn 2018
    Resident Engineer: Nicholas Renaud
    Construction Bid Price: $6,285,819.00
    District: District 6

    Contracts (3) Progress
    # 101096 -- Construction Contract
    Microsilica Overlay Replacement and Related Work along Sections of Interstates 90 & 93 (CRC 28). Completed
    # 115769 -- Design -- Services
    Statewide - Master Service Agreement for design and review services. Final
    # 77866 -- Design -- Hwy Eng Open End
    Master Service Agreement for statewide design and review services. Final

    Bridges

  • - none -
  • Contract Dates
    Notice to Proceed: 11/15/2018
    Contract Information
    Project Designer: Consultant
    Funding Source: Non Federal Aid
    See the Milestone Details tab for additional Project information
    Property Impacts - Right of Way
    no comments
    Environmental Impacts
    no comments
    Project Design
    no comments
    Project Funding
    no comments
    Public Involvement
    no comments
    Construction
    no comments
    Accelerated Bridge Program
    no comments
    No TIP Data Available For This Project
    Project Task Information
    Project Status
    Project Need Form PNF Entered 02/26/2014
    Project Initiation Form PIF Entered 02/26/2014
    Project Initiation Form PRC Submitted 03/17/2014
    Project Review Committee PRC Approved 03/25/2014
    Project Status Advertised 01/13/2018
    Project Management
    100% Design 100% Package Received 05/26/2017
    75% Design 75% Package Received 01/20/2017
    Final Design PS&E Received 10/26/2017
    Final Design PS&E to FAPRO 12/21/2017