Project Description: |
UXBRIDGE- SUPERSTRUCTURE REPLACEMENT, U-02-024, ST 122 (MILLVILLE ROAD) OVER PWRR
The proposed project is a footprint replacement of the existing cement concrete/HMA bridge deck. One existing sidewalk will be maintained. Safety railing and endposts will be upgraded to current standards. Minor approach work is included.
|
Location: |
|
Design Responsibility: | In-House Boston |
Right of Way Responsibility: | MassDOT |
Project Manager: | Hercules L Kyriazidis |
Estimated Total Federal Participating Construction Cost: | N/A |
District: | District 3 |
Current Status: | This project is in the preliminary design phase. |
|
Bridges
|
|
|
|