Project Description: |
DISTRICT 5- SYSTEMATIC BRIDGE PRESERVATION ALONG THE I-495 CORRIDOR
This contract is to clean various components of the district's bridges to prevent the accumulation of deleterious materials such as salt, pigeon debris from deteriorating the various components.
|
Location: | |
Design Responsibility: | In-House Boston |
Right of Way Responsibility: | MassDOT |
Project Manager: | M. Ali Jalinous |
Estimated Total Federal Participating Construction Cost: | N/A |
District: | District 5 |
Current Status: | Final Package to FAPRO (as of 10/26/2017 ) |
|