| Project Description: |
DISTRICT 5- SYSTEMATIC BRIDGE PRESERVATION ALONG THE I-495 CORRIDOR
This contract is to clean various components of the district's bridges to prevent the accumulation of deleterious materials such as salt, pigeon debris from deteriorating the various components.
|
| Location: | |
| Construction Begins: | Summer 2018 |
| Resident Engineer: | Eric Borman![]() |
| Construction Bid Price: | $1,341,746.25 |
| District: | District 5 |
|