DEDHAM- PEDESTRIAN IMPROVEMENTS ALONG ELM STREET & RUSTCRAFT ROAD CORRIDORS
Improvements along Elm Street /Rust Craft Road corridor will primarily consist of installation of new curbing, sidewalks and ramps on both sides of the corridor. This area will also require drainage improvements to modify storm water management from sheet flow to catch basins necessary with the installation of new curb and sidewalk. Minor roadway widening is anticipated to achieve a minimum roadway width to accommodate a 5' bicycle lane. An off-road area for the drop off and pick up at the Dedham Corporate Center MBTA Commuter Rail station has already been constructed by the town.
Location:
  • Town of Dedham
  • Construction Begins: Winter 2020/2021
    Resident Engineer: Fritz Dubuisson
    Construction Bid Price: $2,321,046.07
    District: District 6

    Contracts (1) Progress
    # 113676 -- Construction Contract
    Roadway Reconstruction and Related Work along a Section of Elm Street and Rustcraft Road Completed

    Bridges

  • - none -
  • Contract Dates
    Notice to Proceed: 03/01/2021
    Contract Information
    Project Designer: Municipality
    Funding Source: CONGESTION MIT. AIR QUAL.
    See the Milestone Details tab for additional Project information
    Property Impacts - Right of Way
    no comments
    Environmental Impacts
    no comments
    Project Design
    no comments
    Project Funding
    no comments
    Public Involvement
    no comments
    Construction
    no comments
    Accelerated Bridge Program
    no comments
    No TIP Data Available For This Project
    Project Task Information
    Project Status
    Project Need Form PNF Entered 03/19/2014
    Project Initiation Form PIF Entered 03/19/2014
    Project Initiation Form PRC Submitted 03/19/2014
    Project Review Committee PRC Approved 04/07/2014
    Project Status Advertised 12/19/2020
    Project Management
    100% Design 100% Package Received 04/01/2019
    100% Design 100% Package Rejected 04/22/2019
    100% Design 100% Package Received - Resub 1 05/14/2019
    25% Design 25% Package Received 03/27/2015
    25% Design 25% Package Comments to DE 12/08/2015
    25% Design Design Public Hearing 02/10/2016
    75% Design 75% Package Received 09/06/2016
    Final Design PS&E Received 05/08/2020
    Final Design PS&E Received - Resub 1 09/15/2020
    Final Design PS&E Received - Resub 2 10/21/2020
    Final Design PS&E Received - Resub 3 10/27/2020
    Final Design PS&E Received - Resub 4 11/12/2020