Project Description: |
FRAMINGHAM- CULVERT REPLACEMENT ON ROUTE 126 (HOLLIS STREET) OVER WAUSHAKUM POND BROOK
The project includes the removal of the existing culvert and the replacement with a 32" high by 50" wide elliptical reinforced concrete pipe.
|
Location: |
|
Design Responsibility: | Consultant |
Right of Way Responsibility: | MassDOT |
Project Manager: | Adam W Kiel |
Estimated Total Contract Cost: | $465,621.44 |
Estimated Total Federal Participating Construction Cost: | $532,343.91 |
District: | District 3 |
Current Status: | The Notice to Proceed to begin work on the contract has been issued (as of 06/20/2023 ) |
|