| Project Description: |
DISTRICT 3- HIGHWAY LIGHTING AT VARIOUS LOCATIONS
The intent of this project is to maintain the existing highway lighting systems owned by MassDOT in District 3.
|
| Location: | |
| Design Responsibility: | In-House Boston |
| Right of Way Responsibility: | MassDOT |
| Project Manager: | Charles Hale Jr![]() |
| Estimated Total Contract Cost: | $434,835.82 |
| Estimated Total Federal Participating Construction Cost: | N/A |
| District: | District 3 |
| Current Status: | This project has been advertised for construction bids. (as of 11/08/2014 ) |
|