| Project Description: |
DISTRICT 3- DRAINAGE STRUCTURE AND PIPE CLEANING AT VARIOUS LOCATIONS
The Contract is for the cleaning of drainage structure and pipe networks on State Highways in District 3.
|
| Location: | |
| Construction Begins: | Summer 2017 |
| Resident Engineer: | Michael Russell III![]() |
| Construction Bid Price: | $843,166.05 |
| District: | District 3 |
|
Bridges |
||||||||
|
||||||||||
|
|
|
||||||||||||||||||||||||||||||||