FALL RIVER- IMPROVEMENTS AT VIVEIROS ELEMENTARY SCHOOL (SRTS)
The project is intended to make walking and bicycling a safer and more attractive alternative for children traveling to and from the school. The project proposes to construct a 6 foot wide sidewalk with vertical granite curb along missing sections on Slade Street and Dwelly Street between between Bay Street and Lewis Street. In addition, sidewalk will be constructed where missing along sections of Lewis Street. The project proposes a pavement mill and overlay on Dwelly Street and Slade Street, new MUTCD-compliant signs and pavement markings including “share the road” signs and sharrow pavement markings. To reduce pedestrian crossing widths and improve visibility of pedestrians, curb bump-outs will be constructed at the following intersections: Dwelly Street / Scott Street; Dwelly Street / Lewis Street; Slade Street / Lewis Street; Slade Street / Scott Street; So. Main Street / Dwelly Street; So. Main Street / Slade Street. Additional improvements will include installation of ADA-compliant wheelchair ramps, installation of MUTCD-compliant signs and pavement markings, and minor drainage improvements.
Location:
  • City of Fall River
  • Construction Begins: Winter 2018/2019
    Resident Engineer: Rajat Gogoi
    Construction Bid Price: $1,298,819.68
    District: District 5

    Contracts (2) Progress
    # 105388 -- Construction Contract
    Sidewalk Reconstruction and Related Work (Including Signals) on Sections of Dwelly, South Main, Slade and Adjacent Streets (Safe Routes to School – Carlton M. Viveiros Element Completed
    # 85766 -- Design -- Highway
    Work will consist of providing school assessments and preliminary and final engineering design and construction phase services to the Highway Engineering Division for the 2014 Final

    Bridges

  • - none -
  • Contract Dates
    Notice to Proceed: 01/10/2019
    Contract Information
    Project Designer: Consultant
    Funding Source: TAP
    See the Milestone Details tab for additional Project information
    Property Impacts - Right of Way
    no comments
    Environmental Impacts
    no comments
    Project Design
    no comments
    Project Funding
    no comments
    Public Involvement
    no comments
    Construction
    no comments
    Accelerated Bridge Program
    no comments
    No TIP Data Available For This Project
    Project Task Information
    Project Status
    Project Need Form PNF Entered 05/29/2014
    Project Initiation Form PIF Entered 11/03/2014
    Project Initiation Form PIF Entered 07/10/2015
    Project Initiation Form PIF Entered 11/25/2015
    Project Initiation Form PRC Submitted 11/03/2014
    Project Initiation Form PRC Submitted 11/25/2015
    Project Review Committee PRC Tabled 06/25/2015
    Project Review Committee PRC Tabled 02/11/2016
    Project Review Committee PRC Approved 06/09/2016
    Project Status Advertised 08/04/2018
    Project Management
    100% Design 100% Package Received 02/01/2018
    100% Design 100% Package Comments to DE 03/22/2018
    25% Design 25% Package Received 04/20/2017
    25% Design Design Public Hearing 11/15/2017
    75% Design 75% Package Received 04/20/2017
    75% Design 75% Package Comments to DE 08/30/2017
    Final Design PS&E Received 05/09/2018
    Final Design PS&E Received - Resub 1 07/05/2018