WEYMOUTH- IMPROVEMENTS AT PINGREE ELEMENTARY SCHOOL (SRTS)
include mill and overlay along Commercial Street from 500 ft n of Cottage Street to about 350 ft s of the school driveway. Pedestrian improvements will include wheelchair ramp and sidewalk reconstruction to meet ADA requirements. The curb bump out will narrow the roadway and reduce crossing distance. Share the road signs will be constructed
Location:
  • Town of Weymouth
  • Design Responsibility: Consultant
    Right of Way Responsibility: Municipality
    Project Manager: Albert Miller
    Estimated Total Federal Participating Construction Cost: N/A
    District: District 6
    Current Status: This project is in the preliminary design phase.