| Project Description: |
WEYMOUTH- IMPROVEMENTS AT PINGREE ELEMENTARY SCHOOL (SRTS)
include mill and overlay along Commercial Street from 500 ft n of Cottage Street to about 350 ft s of the school driveway. Pedestrian improvements will include wheelchair ramp and sidewalk reconstruction to meet ADA requirements. The curb bump out will narrow the roadway and reduce crossing distance. Share the road signs will be constructed
|
| Location: |
|
| Design Responsibility: | Consultant |
| Right of Way Responsibility: | Municipality |
| Project Manager: | Albert Miller![]() |
| Estimated Total Federal Participating Construction Cost: | N/A |
| District: | District 6 |
| Current Status: | This project is in the preliminary design phase. |
|
Bridges |
||||||
|
|
|
||