Project Description:
WATERTOWN- IMPROVEMENTS AT HOSMER ELEMENTARY SCHOOL (SRTS)
Improvements that will be constructed include mill and overlay on Boylston Street between Chauncy and Fairfield Street. Pedestrian improvements will include the reconstruction of the wheelchair ramps and sidewalks within the project area. Relocation of the existing crosswalk to a mid-block location to provide more direct route to the school. Bicycle accommodations will include the installation of "share the road" signs.
Location:
  • Town of Watertown
  • Design Responsibility: Consultant
    Right of Way Responsibility: Municipality
    Project Manager: David Shedd
    Estimated Total Federal Participating Construction Cost: N/A
    District: District 6
    Current Status: PS&E Received (as of 08/28/2017 )

    Contracts (0) Progress
    No contracts associated with this project

    Bridges

  • - none -
  • See the Milestone Details tab for additional Project information
    No TIP Data Available For This Project
    Project Task Information
    Project Status
    Project Status PNF Entered 05/29/2014
    Project Status PIF Entered 11/03/2014
    Project Status PIF Entered 11/25/2015
    Project Status PRC Approved 07/20/2016
    Project Status PRC Submitted 11/03/2014
    Project Status PRC Submitted 11/25/2015
    Project Management
    Consultant Contract Process 25% Package Received 11/22/2016
    Consultant Contract Process 75% Package Received 11/22/2016
    Consultant Contract Process 100% Package Received 07/10/2017
    Consultant Contract Process PS&E Received 08/28/2017
    Consultant Contract Process 75% Package Comments to DE 02/24/2017
    Consultant Contract Process PS&E to FAPRO 08/14/2017
    Consultant Contract Process Design Public Hearing 04/05/2017