Project Description: |
WATERTOWN- IMPROVEMENTS AT HOSMER ELEMENTARY SCHOOL (SRTS)
Improvements that will be constructed include mill and overlay on Boylston Street between Chauncy and Fairfield Street. Pedestrian improvements will include the reconstruction of the wheelchair ramps and sidewalks within the project area. Relocation of the existing crosswalk to a mid-block location to provide more direct route to the school. Bicycle accommodations will include the installation of "share the road" signs.
|
Location: |
|
Design Responsibility: | Consultant |
Right of Way Responsibility: | Municipality |
Project Manager: | David Shedd![]() |
Estimated Total Federal Participating Construction Cost: | N/A |
District: | District 6 |
Current Status: | PS&E Received (as of 08/28/2017 ) |
|
Bridges |
|
|
|