Enter a City or Road name to search for a new project:
Advanced Project Search
Project Description:
FRAMINGHAM- PEDESTRIAN HYBRID BEACON INSTALLATION AT ROUTE 9 AND MAYNARD ROAD
The proposed project will construct an at-grade pedestrian crossing across Route 9 in the vicinity of Maynard Road and the Framingham Fire Station. The crossing will be controlled by a pedestrian hybrid beacon (HAWK signal). The project also includes the reconstruction of the existing emergency signal for the Framingham Fire Station on Route 9.
Location:
  • Town of Framingham
  • Design Responsibility: Consultant
    Right of Way Responsibility: MassDOT
    Project Manager: Muazzez G Reardon
    Estimated Total Contract Cost: $730,117.10
    Estimated Total Federal Participating Construction Cost: $904,775.25
    District: District 3
    Current Status: Design Public Hearing (as of 06/28/2017 )

    Contracts (2) Progress
    # 77887 -- Design -- Hwy Eng Open End
    Master Service Agreement for statewide design and review services. Final
    # 86790 -- Design -- Services
    AutoCAD Base Plan Surveying Services Final

    Bridges

  • - none -
  • See the Milestone Details tab for additional Project information
    Property Impacts - Right of Way
    no comments
    Environmental Impacts
    no comments
    Project Design
    no comments
    Project Funding
    no comments
    Public Involvement
    no comments
    Accelerated Bridge Program
    no comments
    No TIP Data Available For This Project
    Project Task Information
    Project Status
    Project Need Form PNF Entered 06/03/2014
    Project Initiation Form PIF Entered 06/03/2014
    Project Initiation Form PRC Submitted 06/03/2014
    Project Review Committee PRC Approved 08/01/2014
    Project Management
    25% Design 25% Package Received 01/23/2015
    25% Design 25% Package Comments to DE 12/07/2015
    25% Design Design Public Hearing 06/28/2017