Project Description: |
CONCORD- RECONSTRUCTION & WIDENING ON ROUTE 2, FROM SANDY POND ROAD TO BRIDGE OVER MBTA/B&M RAILROAD
The project will widen Route 2 to three through lanes from the Route 2 bridge over the MBTA/B&M Railroad to Sandy Pond Road, the terminus of the Crosby Corner grade separation project. New traffic signals including an upgraded pedestrian crossing at Route 126 (Walden Street) will be included.
|
Location: |
|
Design Responsibility: | Consultant |
Right of Way Responsibility: | MassDOT |
Project Manager: | Janhavi Limaye |
Estimated Total Contract Cost: | $8,000,000.00 |
Estimated Total Federal Participating Construction Cost: | N/A |
District: | District 4 |
Current Status: | This project is in the preliminary design phase. |
|
Bridges |
|
|
|