CONCORD- RECONSTRUCTION & WIDENING ON ROUTE 2, FROM SANDY POND ROAD TO BRIDGE OVER MBTA/B&M RAILROAD
The project will widen Route 2 to three through lanes from the Route 2 bridge over the MBTA/B&M Railroad to Sandy Pond Road, the terminus of the Crosby Corner grade separation project. New traffic signals including an upgraded pedestrian crossing at Route 126 (Walden Street) will be included.
|
| Location: |
|
| Design Responsibility: | Consultant |
| Right of Way Responsibility: | MassDOT |
| Project Manager: | Janhavi Limaye![]() |
| Estimated Total Contract Cost: | $8,000,000.00 |
| Estimated Total Federal Participating Construction Cost: | N/A |
| District: | District 4 |
| Current Status: | This project is in the preliminary design phase. |
|