Enter a City or Road name to search for a new project:
Advanced Project Search
Project Description:
CONCORD- RECONSTRUCTION & WIDENING ON ROUTE 2, FROM SANDY POND ROAD TO BRIDGE OVER MBTA/B&M RAILROAD
The project will widen Route 2 to three through lanes from the Route 2 bridge over the MBTA/B&M Railroad to Sandy Pond Road, the terminus of the Crosby Corner grade separation project. New traffic signals including an upgraded pedestrian crossing at Route 126 (Walden Street) will be included.
Location:
  • Town of Concord
  • Design Responsibility: Consultant
    Right of Way Responsibility: MassDOT
    Project Manager: Janhavi Limaye
    Estimated Total Federal Participating Construction Cost: N/A
    District: District 4
    Current Status: This project is in the preliminary design phase.

    Contracts (0) Progress
    No contracts associated with this project

    Bridges

  • - none -
  • See the Milestone Details tab for additional Project information
    No TIP Data Available For This Project