| Project Description: |
NORTH ADAMS- TRAFFIC SIGNAL REPLACEMENT AT ASHLAND STREET (ROUTE 8A) & AMERICAN LEGION DRIVE
The existing traffic signal at this intersection runs "pre-timed" and is in need of an upgrade to current standards. Traffic signals, vehicle detection, and controller will be replaced.
|
| Location: |
|
| Project Manager: | Charles Hale Jr![]() |
| Estimated Total Contract Cost: | $273,284.50 |
| Estimated Total Federal Participating Construction Cost: | N/A |
| District: | District 1 |
| Current Status: | This project is in the preliminary design phase. |
|
Bridges |
||||||
|
|
|
||