| Project Description: |
ROCKLAND– BRIDGE REPLACEMENT, R-08-001 & R-08-002, STATE ROUTE 123 OVER FRENCH STREAM & REPAIRS TO STUDLEY’S POND DAM
The work done under this contract consists of repairs to the dam including slope stabilization, retaining wall repairs, construction of a larger spillway/box culvert with outlet works for Studley’s Pond, and abandonment of the secondary spillway R-08-002.
|
| Location: |
|
| Design Responsibility: | Consultant |
| Right of Way Responsibility: | MassDOT |
| Project Manager: | Harry Adolphe![]() |
| Estimated Total Contract Cost: | $8,266,270.15 |
| Estimated Total Federal Participating Construction Cost: | N/A |
| District: | District 5 |
| Current Status: | 25% Package Received - Resub 1 (as of 05/09/2018 ) |
|