| Project Description: |
WILMINGTON- RECONSTRUCTION ON ROUTE 38 (MAIN STREET), FROM ROUTE 62 TO THE WOBURN C.L.
The project will reconstruct Route 38 from Route 62 to the Woburn City line. The roadway will consist of two 11 foot lanes, two 5 foot bike lanes and a 6 foot sidewalk. Turn lanes and upgraded traffic signals will be installed at Route 62.
|
| Location: |
|
| Construction Begins: | Spring 2026 |
| Resident Engineer: | Benjamin McCarthy![]() |
| Construction Bid Price: | $36,389,683.00 |
| District: | District 4 |
|