| Project Description: |
WILMINGTON- RECONSTRUCTION ON ROUTE 38 (MAIN STREET), FROM ROUTE 62 TO THE WOBURN C.L.
The project will reconstruct Route 38 from Route 62 to the Woburn City line. The roadway will consist of two 11 foot lanes, two 5 foot bike lanes and a 6 foot sidewalk. Turn lanes and upgraded traffic signals will be installed at Route 62.
|
| Location: |
|
| Design Responsibility: | Consultant |
| Right of Way Responsibility: | MassDOT |
| Construction Begins: | Winter 2025/2026 |
| Project Manager: | Eamon Kernan![]() |
| Estimated Total Contract Cost: | $42,886,798.05 |
| Estimated Total Federal Participating Construction Cost: | $42,254,204.45 |
| District: | District 4 |
| Current Status: | This project has been advertised for construction bids. (as of 09/13/2025 ) |
|