Project Description:
WILMINGTON- RECONSTRUCTION ON ROUTE 38 (MAIN STREET), FROM ROUTE 62 TO THE WOBURN C.L.
The project will reconstruct Route 38 from Route 62 to the Woburn City line. The roadway will consist of two 11 foot lanes, two 5 foot bike lanes and a 6 foot sidewalk. Turn lanes and upgraded traffic signals will be installed at Route 62.
Location:
  • Town of Wilmington
  • Design Responsibility: Consultant
    Right of Way Responsibility: MassDOT
    Construction Begins: Summer 2025
    Project Manager: Eamon Kernan
    Estimated Total Contract Cost: $37,544,045.73
    Estimated Total Federal Participating Construction Cost: $37,452,644.61
    Funding Provision: This project is planned to be funded through the 2025 Transportation Improvement Program for the Boston Metropolitan Planning Organization.
    District: District 4
    Current Status: 100% Package Received (as of 01/19/2024 )

    Contracts (1) Progress
    # 77863 -- Design -- Hwy Eng Open End
    Master Service Agreement for statewide design and review services. Final

    Bridges

    See the Milestone Details tab for additional Project information
    Property Impacts - Right of Way
    no comments
    Environmental Impacts
    no comments
    Project Design
    no comments
    Project Funding
    no comments
    Public Involvement
    no comments
    Accelerated Bridge Program
    no comments
    Planned Federal FY: 2025
    Responsible MPO: Boston Metropolitan Planning Organization
    Location: Municipality
    Cities: WILMINGTON
    Category: Advertised Projects Constr.
    Budget Section: 1A
    Advance Construct: No
    Air Quality Exempt: No

  • Adj. TFPC: $23,731,429 (CMAQ; HSIP; STBG)
  • Category FA - Hwy Safety Improvement Prgm (HSIP)
    Federal Cost: $900,000.00
    State Cost: $100,000.00
    Total Cost: $1,000,000.00

    Planned Federal FY: 2025
    Responsible MPO: Boston Metropolitan Planning Organization
    Location: Municipality
    Cities: WILMINGTON
    Category: Advertised Projects Constr.
    Budget Section: 1A
    Advance Construct: No
    Air Quality Exempt: No

  • Adj. TFPC: $23,731,429 (CMAQ; HSIP; STBG)
  • Category FA - Congestion Mitigation/Air Quality (CMAQ)
    Federal Cost: $1,760,000.00
    State Cost: $440,000.00
    Total Cost: $2,200,000.00

    Planned Federal FY: 2025
    Responsible MPO: Boston Metropolitan Planning Organization
    Location: Municipality
    Cities: WILMINGTON
    Category: Advertised Projects Constr.
    Budget Section: 1A
    Advance Construct: No
    Air Quality Exempt: No

  • Adj. TFPC: $23,731,429 (CMAQ; HSIP; STBG)
  • Category FA - Surface Trans. Block Grant (STBG)
    Federal Cost: $16,425,143.20
    State Cost: $4,106,285.80
    Total Cost: $20,531,429.00

    Project Task Information
    Project Status
    Project Need Form PNF Entered 08/28/2014
    Project Initiation Form PIF Entered 09/08/2014
    Project Initiation Form PRC Submitted 10/14/2014
    Project Review Committee PRC Approved 11/06/2014
    Project Management
    100% Design 100% Package Received 01/19/2024
    25% Design 25% Package Received 10/26/2017
    25% Design 25% Package Comments to DE 05/07/2018
    75% Design 75% Package Received 01/18/2021
    75% Design 75% Package Comments to DE 04/27/2021