Project Description: |
BURLINGTON- ADAPTIVE TRAFFIC CONTROL SIGNAL SYSTEM INSTALLATION ON CAMBRIDGE STREET, MIDDLESEX TURNPIKE & BURLINGTON MALL ROAD
Installation of compatible traffic signal control equipment, video detection, communication devices and software to integrate 11 MassDOT and 16 Town owned traffic signal locations into one adaptive signal system.
|
Location: |
|
Resident Engineer: | Anthony Neve |
Construction Bid Price: | $1,627,652.50 |
District: | District 4 |
|
Bridges |
|
|
|
|