Project Description: |
BOSTON- REMOVAL AND REPLACEMENT OF THE TED WILLIAMS TUNNEL CEILING SYSTEM (CRC 14A - DESIGN ONLY)
Removal and replacement of the ceiling system will include the fastening systems, air flow calculations, and material selection. Project may also include fire and heat sensors, fire protection systems, communication and other system to be relocated.
|
Location: |
|
Design Responsibility: | Consultant |
Right of Way Responsibility: | MassDOT |
Project Manager: | Steven E McLaughlin |
Estimated Total Contract Cost: | $46,000,000.00 |
Estimated Total Federal Participating Construction Cost: | N/A |
District: | District 6 |
Current Status: | This project is in the preliminary design phase. |
|
Bridges |
|
|
|