Project Description:
CHELSEA- RECONSTRUCTION ON BROADWAY (ROUTE 107), FROM CITY HALL AVENUE TO THE REVERE C.L.
This project involves the reconstruction of one mile of Broadway. Improvements tot he roadway will include surface and subsurface work include replacement of utilities. Construction of a dedicate bike lane along Broadway. Upgrades to the existing sidewalk network including ADA compliant ramps at all intersections.
Location:
  • City of Chelsea
  • Design Responsibility: Municipality
    Right of Way Responsibility: Municipality
    Construction Begins: Spring 2022
    Project Manager: Lawrence Cash
    Estimated Total Contract Cost: $11,441,600.88
    Estimated Total Federal Participating Construction Cost: $11,301,176.04
    Funding Provision: This project is planned to be funded through the 2022 Transportation Improvement Program for the Boston Metropolitan Planning Organization.
    District: District 6
    Current Status: 100% Package Comments to DE (as of 07/23/2021 )

    Contracts (0) Progress
    No contracts associated with this project

    Bridges

  • - none -
  • See the Milestone Details tab for additional Project information
    Property Impacts - Right of Way
    no comments
    Environmental Impacts
    no comments
    Project Design
    no comments
    Project Funding
    no comments
    Public Involvement
    no comments
    Accelerated Bridge Program
    no comments
    Planned Federal FY: 2022
    Responsible MPO: Boston Metropolitan Planning Organization
    Location: Municipality
    Cities: CHELSEA
    Category: Advertised Projects Constr.
    Budget Section: 1A
    Advance Construct: No
    Air Quality Exempt: No

  • Construction; CMAQ+STBG Total Cost = $10,278,940; MPO Evaluation Score = 61
  • Category FA - Congestion Mitigation/Air Quality (CMAQ)
    Federal Cost: $800,000.00
    State Cost: $200,000.00
    Total Cost: $1,000,000.00

    Planned Federal FY: 2022
    Responsible MPO: Boston Metropolitan Planning Organization
    Location: Municipality
    Cities: CHELSEA
    Category: Advertised Projects Constr.
    Budget Section: 1A
    Advance Construct: No
    Air Quality Exempt: No

  • STBG revised from $9,278,940 to $10,301,176 via STIP Action 6.
  • Category FA - Surface Trans. Block Grant (STBG)
    Federal Cost: $8,240,940.80
    State Cost: $2,060,235.20
    Total Cost: $10,301,176.00

    Project Task Information
    Project Status
    Project Need Form PNF Entered 10/21/2014
    Project Initiation Form PIF Entered 10/21/2014
    Project Initiation Form PIF Entered 07/10/2015
    Project Initiation Form PRC Submitted 10/21/2014
    Project Review Committee PRC Tabled 11/06/2014
    Project Review Committee PRC Approved 06/25/2015
    Project Management
    100% Design 100% Package Received 05/14/2021
    100% Design 100% Package Comments to DE 07/23/2021
    25% Design 25% Package Received 04/14/2017
    25% Design 25% Package Comments to DE 09/26/2017
    25% Design Design Public Hearing 03/21/2019
    75% Design 75% Package Received 07/09/2020
    75% Design 75% Package Comments to DE 10/15/2020