| Project Description: |
BROCKTON- CORRIDOR IMPROVEMENTS ON ROUTE 123 (BELMONT STREET), FROM ANGUS BEATON DRIVE TO WEST STREET
Work on the project includes resurfacing and box cut widening along Route 123 to provide a consistent roadway cross seciton, bicycle accomodating sholders and accessible sidewalks. Traffic signals will be reconstructed to provide ADA accessible elements.
|
| Location: |
|
| Design Responsibility: | Consultant |
| Right of Way Responsibility: | MassDOT |
| Project Manager: | Greg Frazier![]() |
| Estimated Total Federal Participating Construction Cost: | N/A |
| District: | District 5 |
| Current Status: | This project is in the preliminary design phase. |
|