Project Description: |
BOSTON- TED WILLIAMS TUNNEL CEILING FRAMING SYSTEM ANALYSIS AND MODIFICATIONS (CRC 14A)
Project will include the modification of the existing Ceiling Frame within the Ted Williams Tunnel
|
Location: |
|
Design Responsibility: | Consultant |
Right of Way Responsibility: | MassDOT |
Project Manager: | Steven E McLaughlin |
Estimated Total Contract Cost: | $4,600,000.00 |
Estimated Total Federal Participating Construction Cost: | N/A |
District: | District 6 |
Current Status: | This project is in the preliminary design phase. |
|
Bridges |
|
|
|