Project Description: |
ROCKLAND- BUS SHELTER REPLACEMENT AT ROUTE 228 PARK AND RIDE
Work will involve the removal and replacement of the bus shelter structures located within the Rockland Park & Ride location. Base pads will be modified to meet current ADA/AAB standards.
|
Location: |
|
Design Responsibility: | In-House Boston |
Right of Way Responsibility: | MassDOT |
Project Manager: | George Ayoub |
Estimated Total Contract Cost: | $90,000.00 |
Estimated Total Federal Participating Construction Cost: | N/A |
District: | District 5 |
Current Status: | This project is in the preliminary design phase. |
|
Bridges |
|
|
|