| Project Description: |
ROCKLAND- BUS SHELTER REPLACEMENT AT ROUTE 228 PARK AND RIDE
Work will involve the removal and replacement of the bus shelter structures located within the Rockland Park & Ride location. Base pads will be modified to meet current ADA/AAB standards.
|
| Location: |
|
| Design Responsibility: | In-House Boston |
| Right of Way Responsibility: | MassDOT |
| Project Manager: | George Ayoub![]() |
| Estimated Total Contract Cost: | $90,000.00 |
| Estimated Total Federal Participating Construction Cost: | N/A |
| District: | District 5 |
| Current Status: | This project is in the preliminary design phase. |
|