Project Description: |
DISTRICT 6- GENERATOR MAINTENANCE AND TESTING AT VARIOUS LOCATIONS
The purpose of the contract will be to provide labor, equipment, and materials to perform ‘3-yr overhauls’ of the existing machinery, including testing of equipment and load banks.
|
Location: | |
Construction Begins: | Winter 2015/2016 |
Resident Engineer: | Daniel Kelly |
Construction Bid Price: | $299,450.00 |
District: | District 6 |
|
Bridges |
|
|
|
|