Project Description: |
MIDDLEBOROUGH- INTERIM IMPROVEMENTS AT ROUTES 18/28/44 (ROTARY)
This project is intended to address ongoing safety and congestion issues on an interim basis. Proposed improvements include: striping of the rotary to a 2-lane facility; new signage, and geometric improvements at the access/egress points to/from the rotary.
|
Location: |
|
Construction Begins: | Spring 2018 |
Resident Engineer: | Kenneth Belgrave |
Construction Bid Price: | $1,111,104.25 |
District: | District 5 |
|
Bridges |
|
|
|
|