Project Description: |
DISTRICT 6- SCHEDULED & EMERGENCY FIRE LINE, STANDPIPE, AND HYDRANT REPAIRS AND IMPROVEMENTS AT VARIOUS LOCATIONS
Existing contracts involve pressure testing dry hydrant and fire-fighting water supply lines; this contract will enable the DOT to direct repairs (subsurface or otherwise) when needed to repair or improve existing piping.
|
Location: | |
Construction Begins: | Summer 2015 |
Resident Engineer: | William Clark |
Construction Bid Price: | $711,710.00 |
District: | District 6 |
|
Bridges |
|
|
|
|