UXBRIDGE- RECONSTRUCTION OF ROUTE 122 (SOUTH MAIN STREET), FROM SUSAN PARKWAY TO ROUTE 16
The proposed improvements include a combination of roadway reconstruction and resurfacing, sidewalk construction or reconstruction and upgrade or installation of drainage structures.
Location:
  • Town of Uxbridge
  • Design Responsibility: Consultant
    Construction Begins: Autumn 2024
    Project Manager: Janhavi Limaye
    Estimated Total Contract Cost: $12,146,813.30
    Estimated Total Federal Participating Construction Cost: $14,980,151.95
    Funding Provision: This project is planned to be funded through the 2024 Transportation Improvement Program for the Central Massachusetts Metropolitan Planning Organization.
    District: District 3
    Current Status: PS&E Received - Resub 1 (as of 04/11/2024 )

    Contracts (1) Progress
    # 77847 -- Design -- Hwy Eng Open End
    Master Service Agreement for statewide design and review services. Final

    Bridges

  • - none -
  • See the Milestone Details tab for additional Project information
    Property Impacts - Right of Way
    no comments
    Environmental Impacts
    no comments
    Project Design
    no comments
    Project Funding
    no comments
    Public Involvement
    no comments
    Accelerated Bridge Program
    no comments
    Planned Federal FY: 2024
    Responsible MPO: Central Massachusetts Metropolitan Planning Organization
    Location: Municipality
    Cities: UXBRIDGE
    Category: Advertised Projects Constr.
    Budget Section: 1A
    Advance Construct: No
    Air Quality Exempt: No

  • Construction, STBG + TAP Total Project Cost = $10,624,014, Design Status = 100%, PM Score = 11 out of 27
  • Category FA - Trans. Alternative Prgm (TAP)
    Federal Cost: $400,000.00
    State Cost: $100,000.00
    Total Cost: $500,000.00

    Planned Federal FY: 2024
    Responsible MPO: Central Massachusetts Metropolitan Planning Organization
    Location: Municipality
    Cities: UXBRIDGE
    Category: Advertised Projects Constr.
    Budget Section: 1A
    Advance Construct: No
    Air Quality Exempt: No

  • Construction, STBG + TAP Total Project Cost = $10,624,014, Design Status = 100%, PM Score = 11 out of 27
  • Category FA - Surface Trans. Block Grant (STBG)
    Federal Cost: $8,099,211.20
    State Cost: $2,024,802.80
    Total Cost: $10,124,014.00

    Project Task Information
    Project Status
    Project Need Form PNF Entered 03/02/2015
    Project Initiation Form PIF Entered 03/02/2015
    Project Initiation Form PRC Submitted 03/02/2015
    Project Review Committee PRC Approved 03/03/2015
    Project Management
    100% Design 100% Package Received 01/12/2022
    100% Design 100% Package Comments to DE 03/17/2022
    100% Design 100% Package Received - Resub 1 07/27/2023
    25% Design Design Public Hearing 11/09/2022
    75% Design 75% Package Received 04/08/2015
    75% Design 75% Package Comments to DE 11/23/2016
    Final Design PS&E Received 03/29/2024
    Final Design PS&E Received - Resub 1 04/11/2024