| Project Description: |
STOCKBRIDGE- DUMPING GROUND CLOSURE AT I-90 MEDIAN (MM5.8)
Project consists of the consolidation and capping of a solid waste dumping area on I-90 in Stockbridge at mm5.8 to conform to the corrective action design (CAD)
|
| Location: |
|
| Construction Begins: | Summer 2016 |
| Resident Engineer: | Cathy Spaniol![]() |
| Construction Bid Price: | $328,894.00 |
| District: | District 1 |
|
Bridges |
||||||||
|
||||||||||
|
|
|
||||||||||||||||||||||||||||||||