Project Description: |
STOCKBRIDGE- DUMPING GROUND CLOSURE AT I-90 MEDIAN (MM5.8)
Project consists of the consolidation and capping of a solid waste dumping area on I-90 in Stockbridge at mm5.8 to conform to the corrective action design (CAD)
|
Location: |
|
Construction Begins: | Summer 2016 |
Resident Engineer: | Cathy Spaniol |
Construction Bid Price: | $328,894.00 |
District: | District 1 |
|
Bridges |
|
|
|
|