Project Description:
ASHBY- TOWNSEND- RETAINING WALL RECONSTRUCTION ON ROUTE 119, FROM WHEELER ROAD TO ROUTE 31
The proposed work will involve rehabilitation of the roadway and retaining wall repair. The initial design effort will involve an alternatives analysis to determine the specific scope of work. The effort will look at reconstruction with realignment and wall reconstruction, alternative cost-effective soil stabilization techniques, and potentially relocating Route 119 in part (southbound) or in whole. The final scope of work, including proposed cross-section, and cost will determined from this effort.
Location:
  • Town of Ashby
  • Town of Townsend
  • Design Responsibility: Consultant
    Right of Way Responsibility: MassDOT
    Project Manager: Ryan P. Wilcox
    Estimated Total Federal Participating Construction Cost: N/A
    District: District 3
    Current Status: This project is in the preliminary design phase.

    Contracts (0) Progress
    No contracts associated with this project

    Bridges

  • - none -
  • See the Milestone Details tab for additional Project information
    No TIP Data Available For This Project