Project Description: |
WEST BROOKFIELD- SIDEWALK AND WHEELCHAIR CONSTRUCTION ON ROUTE 9
(Split out from #608023) Work consists of constructing new sidewalk and wheelchair ramps on the east side of Route 9 in West Brookfield from Foster Hill Road to Ridge Street.
|
Location: |
|
Design Responsibility: | Consultant |
Right of Way Responsibility: | MassDOT |
Project Manager: | David Shedd![]() |
Estimated Total Federal Participating Construction Cost: | N/A |
District: | District 2 |
Current Status: | This project is in the preliminary design phase. |
|
Bridges |
|
|
|