BOSTON- CALLAHAN TUNNEL CEILING RECONSTRUCTION AND OTHER CONTROL SYSTEMS
This project involves the removal of the existing Callahan Tunnel ceiling system and installation of precast arch-sections and improve control system
|
| Location: |
|
| Design Responsibility: | Consultant |
| Right of Way Responsibility: | MassDOT |
| Project Manager: | Hema P Bhatt![]() |
| Estimated Total Contract Cost: | $69,000,000.00 |
| Estimated Total Federal Participating Construction Cost: | N/A |
| District: | District 6 |
| Current Status: | This project is in the preliminary design phase. |
|