Project Description: |
BOSTON- CALLAHAN TUNNEL CEILING RECONSTRUCTION, NEW JET FANS, AND OTHER CONTROL SYSTEMS
This project involves the removal of the existing Callahan Tunnel ceiling system and repair and fireproof tunnel, install jet fans and improve control system
|
Location: |
|
Design Responsibility: | Consultant |
Right of Way Responsibility: | MassDOT |
Project Manager: | Hema P Bhatt |
Estimated Total Contract Cost: | $20,125,000.00 |
Estimated Total Federal Participating Construction Cost: | N/A |
District: | District 6 |
Current Status: | This project is in the preliminary design phase. |
|