| Project Description: |
MONROE- BRIDGE REPLACEMENT, M-26-004, RAYCROFT ROAD OVER DUNBAR BROOK
Work consiste of replacing the existing bridge structure in its entirety.
|
| Location: |
|
| Design Responsibility: | Consultant |
| Right of Way Responsibility: | MassDOT |
| Project Manager: | William F Brown![]() |
| Estimated Total Contract Cost: | $597,861.00 |
| Estimated Total Federal Participating Construction Cost: | $679,387.50 |
| District: | District 1 |
| Current Status: | This project is in the preliminary design phase. |
|