Project Description:
|
LUDLOW- WILBRAHAM- BRIDGE PRESERVATION, L-16-002=W-35-002 (0MA), EAST STREET OVER THE CHICOPEE RIVER
The work proposed under this project to rehabilitate the East Street Bridge will include cleaning and painting, sidewalk and safety sidewalk replacement, asphaltic plug joint installation, removal and resetting of curb, concrete repairs, refurbishment of bearing plates with new anchor bolts and paved swale and rip-rap installation. Temporary bridge beam support will be required during replacement of bridge seat.
|