Project Description:
LUDLOW- WILBRAHAM- BRIDGE PRESERVATION, L-16-002=W-35-002 (0MA), EAST STREET OVER THE CHICOPEE RIVER
The work proposed under this project to rehabilitate the East Street Bridge will include cleaning and painting, sidewalk and safety sidewalk replacement, asphaltic plug joint installation, removal and resetting of curb, concrete repairs, refurbishment of bearing plates with new anchor bolts and paved swale and rip-rap installation. Temporary bridge beam support will be required during replacement of bridge seat.
Location:
  • Town of Ludlow
  • Design Responsibility: Consultant
    Right of Way Responsibility: Municipality
    Project Manager: Alwin Ramirez
    Estimated Total Federal Participating Construction Cost: N/A
    District: District 2
    Current Status: This project is in the preliminary design phase.

    Contracts (0) Progress
    No contracts associated with this project

    Bridges

    • L16002 
    See the Milestone Details tab for additional Project information
    No TIP Data Available For This Project