Project Description: |
SHEFFIELD- BRIDGE REPLACEMENT, S-10-019, BERKSHIRE SCHOOL ROAD OVER SCHENOB BROOK
Work consists of replacing the existing bridge.
|
Location: |
|
Construction Begins: | Summer 2019 |
Resident Engineer: | Philip Gentile |
Construction Bid Price: | $3,271,362.00 |
District: | District 1 |
|