| Project Description: |
DISTRICT 4- DRAINAGE STRUCTURE RECONSTRUCTION AT VARIOUS LOCATIONS
District 4 Wide Drainage Structure Reconstruction at VArious Locations
|
| Location: | |
| Construction Begins: | Spring 2016 |
| Resident Engineer: | William Pelletier![]() |
| Construction Bid Price: | $331,031.00 |
| District: | District 4 |
|
Bridges |
||||||||
|
||||||||||
|
|
|
|||||||||||||||||||||||||||||