Project Description: |
WESTON - REPAIRS AND IMPROVEMENTS ON TWO SALT SHEDS AT 668 SOUTH AVENUE
Two salt sheds are in need of repair. One shed needs its rear wall rebuilt to prevent salt from entering the adjacent wetland. The other shed need its rear wall reinforce.
|
Location: | |
Design Responsibility: | Consultant |
Right of Way Responsibility: | MassDOT |
Construction Begins: | Autumn 2016 |
Project Manager: | Edmond Libsch |
Estimated Total Contract Cost: | $547,011.30 |
Estimated Total Federal Participating Construction Cost: | N/A |
District: | District 3 |
Current Status: | This project has been advertised for construction bids. (as of 07/02/2016 ) |
|