| Project Description: |
FRAMINGHAM- NATICK- ADAPTIVE SIGNAL CONTROL ON ROUTE 9 (WORCESTER ROAD)
Installation of adaptive traffic control signal equipment, vehicle detection, communication equipment, and managing software at 5 traffic signals (3 in Framingham + 2 in Natick) on Route 9.
|
| Location: |
|
| Construction Begins: | Winter 2016/2017 |
| Resident Engineer: | Alan Webb![]() |
| Construction Bid Price: | $414,414.00 |
| District: | District 3 |
|
Bridges |
||||||||
|
||||||||||
|
|
|
||||||||||||||||||||||||||||||||||||||||||||