Project Description: |
LENOX- CONSTRUCTION OF PRE-ENGINEERED STORAGE FACILITY AT DISTRICT ONE ADMINISTRATION COMPLEX
Work under this contract shall consist of providing all necessary labor, materials, equipment and permitting to construct a pre-engineered storage facility within the property of the MassDOT District One Administration Complex in Lenox.
|
Location: |
|
Design Responsibility: | In-House Boston |
Right of Way Responsibility: | MassDOT |
Project Manager: | Edmond Libsch |
Estimated Total Contract Cost: | $750,000.00 |
Estimated Total Federal Participating Construction Cost: | N/A |
District: | District 1 |
Current Status: | This project is in the preliminary design phase. |
|