Project Description:
GROVELAND- GROVELAND COMMUNITY TRAIL, FROM MAIN STREET TO KING STREET
The project consists of the construction of a shared use trail along the former railroad corridor (Georgetown branch) from King Street at the Georgetown line northwest to Main Street. The trail will be 10 feet wide with 2-3 foot shoulders. A trail head and parking area will be built at King Street and at Main Street. The project length is approximately 2 miles and the trail crosses Ashcroft Terrace, School Street and Center Street. The project is part of the Merrimack River Trail system and a connection to the Border to Boston Trail.
Location:
  • Town of Groveland
  • Construction Begins: Autumn 2021
    Resident Engineer: Aldo Cassano Jr.
    Construction Bid Price: $2,241,259.35
    District: District 4
    Current Status: Project is physically 100% complete. (as of 10/17/2023)

    Contracts (1) Progress
    # 115131 -- Construction Contract
    Construction of a Shared-Use Path (Groveland Community Trail) 100% Complete

    Bridges

  • - none -
  • Contract Dates
    Notice to Proceed: 09/27/2021
    Contract Information
    Project Designer: Municipality
    Funding Source: FA - Surface Trans. Block Grant (STBG)
    See the Milestone Details tab for additional Project information
    Property Impacts - Right of Way
    no comments
    Environmental Impacts
    no comments
    Project Design
    no comments
    Project Funding
    no comments
    Public Involvement
    no comments
    Construction
    Current Status
    Project is physically 100% complete.
    Accelerated Bridge Program
    no comments
    No TIP Data Available For This Project
    Project Task Information
    Project Status
    Project Need Form PNF Entered 09/14/2015
    Project Initiation Form PIF Entered 09/15/2015
    Project Initiation Form PRC Submitted 09/15/2015
    Project Review Committee PRC Approved 02/11/2016
    Project Status Advertised 07/10/2021
    Project Management
    100% Design 100% Package Received 09/12/2018
    100% Design 100% Package Comments to DE 01/15/2019
    25% Design 25% Package Received 07/08/2016
    25% Design 25% Package Comments to DE 12/13/2016
    25% Design Design Public Hearing 05/18/2017
    75% Design 75% Package Received 01/22/2018
    75% Design 75% Package Comments to DE 05/14/2018
    Final Design PS&E Received 03/31/2021
    Final Design PS&E Received - Resub 1 05/27/2021
    Final Design PS&E Received - Resub 2 06/21/2021