| Project Description: |
GRAFTON- CLEANING AND PAINTING 2 BRIDGES ON SNOW ROAD AND BRIGHAM HILL ROAD OVER I-90
This is a routine maintenance project that will address the cleaning and painting of two bridges in Grafton (Snow Road and Brigham Hill Road over I 90)
|
| Location: |
|
| Design Responsibility: | In-House Boston |
| Right of Way Responsibility: | MassDOT |
| Project Manager: | Genesis PozDiaz![]() |
| Estimated Total Contract Cost: | $884,450.00 |
| Estimated Total Federal Participating Construction Cost: | N/A |
| District: | District 3 |
| Current Status: | This project is in the preliminary design phase. |
|
Bridges |
||||||
|
|
|
|||||||||||||||||||||||