Project Description:
BEVERLY- RECONSTRUCTION OF BRIDGE STREET
The project involves rehabilitation of pavement and sidewalks along the Bridge Street corridor from the Danvers town line to River Street, excluding the Hall Whitaker drawbridge. The project includes cross section improvements to accommodate on-street parking and on-street bicycle accommodations. Existing traffic signal equipment at the intersection of Bridge Street at Livingstone Avenue will be upgraded, and new traffic signals will be installed at the intersection of Bridge Street with Kernwood Avenue and the intersection of Bridge Street with River Street. Under the proposed project, continuous cement concrete sidewalks with vertical granite curb will be provided along both sides of the roadway for the full length of the project. As part of the proposed project, a 7 foot wide parking shoulder will be provided on the eastbound side of the roadway to prevent vehicles from parking on the sidewalk. Additionally, 5 foot wide bicycle lanes shoulder will be provided along the corridor. Minor realignments will be performed at the intersections of Bridge Street with Cressy Street, County Way/Bates Park Avenue, and Eastern Avenue/Dolloff Avenue.
Location:
  • City of Beverly
  • Construction Begins: Winter 2023/2024
    Resident Engineer: Lucas Perkins
    Construction Bid Price: $12,561,000.00
    District: District 4

    Contracts (1) Progress
    # 124031 -- Construction Contract
    Reconstruction of Bridge Street 54% Complete

    Bridges

  • - none -
  • Contract Dates
    Notice to Proceed: 12/28/2023
    Contract Information
    Project Designer: Municipality
    Funding Source: FED. AID. ACCELERATED BRIDGE
    See the Milestone Details tab for additional Project information
    Property Impacts - Right of Way
    no comments
    Environmental Impacts
    no comments
    Project Design
    no comments
    Project Funding
    no comments
    Public Involvement
    no comments
    Construction
    no comments
    Accelerated Bridge Program
    no comments
    No TIP Data Available For This Project
    Project Task Information
    Project Status
    Project Need Form PNF Entered 10/13/2015
    Project Initiation Form PIF Entered 10/13/2015
    Project Initiation Form PRC Submitted 10/13/2015
    Project Review Committee PRC Approved 02/11/2016
    Project Status Advertised 09/09/2023
    Project Management
    100% Design 100% Package Received 02/23/2023
    25% Design 25% Package Received 03/01/2018
    25% Design 25% Package Comments to DE 04/25/2019
    25% Design Design Public Hearing 07/21/2020
    75% Design 75% Package Received 10/28/2021
    75% Design 75% Package Comments to DE 12/07/2021
    75% Design 75% Plans Approved 12/16/2021
    Final Design PS&E Received 08/18/2023
    Final Design PS&E to FAPRO 08/28/2023