| Project Description: |
LEXINGTON- BELMONT- ARLINGTON- CAMBRIDGE- PAVEMENT PRESERVATION ON ROUTE 2
NHS Pavement preservation of Route 2 from limit of Lexington Route 2 over I-95 project to limit of Cambridge Route 2 & 16 intersection.
|
| Location: |
|
| Design Responsibility: | In-House Boston |
| Right of Way Responsibility: | MassDOT |
| Project Manager: | Violet Wilkins![]() |
| Estimated Total Federal Participating Construction Cost: | N/A |
| District: | District 4 |
| Current Status: | This project is in the preliminary design phase. |
|