| Project Description: |
STURBRIDGE- STORMWATER IMPROVEMENTS ALONG ROUTE 20 AND INTERSTATE 84
Stormwater improvements to treat roadway runoff entering Pistol Pond in Sturbridge.
|
| Location: |
|
| Construction Begins: | Summer 2018 |
| Resident Engineer: | Peter Kurt![]() |
| Construction Bid Price: | $419,261.50 |
| District: | District 3 |
|
Bridges |
||||||||||||||
|
||||||||||
|
|
|
|||||||||||||||||||||||||||||||||||||||||||||||